I-81 Freight Rail Study Falls Short

The state finally released the long-awaited study to determine the costs and potential of delivering truck freight from I-81 to rail.

Shenandoah Valley Network sees the freight rail study as a missed opportunity. Despite legislators’ request for an in-depth assessment of rail’s potential, the study fails to deliver the comprehensive analysis our policy-makers need to choose I-81 improvement options that are affordable, efficient and offer the lowest possible impact to the communities in western Virginia.

Download the study (prepared by Cambridge Systems, draft final report dated 12/2009) Feasibility Plan for Maximum Truck to Rail Diversion in the I-81 Corridor (PDF)

View the Shenandoah Valley Network’s comment (PDF) on the study.

The Roanoke Times: Rail could be the answer to I-81 gridlock, report says

Posted in Interstate 81 News